The RWA, 4th Block, Koramangala, has arranged a meeting on 18-Apr-2017 (6 PM) with BWSSB Engineers, Corporator M. Chandrappa, Contractor and residents of 4th Block to discuss about the various grievances while laying higher dimension sewage pipes by BWSSB. Welcoming the Corporator M. Chandrappa, BWSSB Engineers, Contractor and the residents, G. M. Shetty, President of the 4th Block, RWA, mentioned that care should be taken by the Contractor while laying the pipes with regard to alignments, house connections without damaging the electrical, telephone cables, water pipes etc. He also insisted for supervision by the BWSSB Engineers while carrying out the said work. Some of the residents have also put forth their grievances as pointed out above and brought to the notice regarding filling of soil, consideration, metaling and asphalting etc.
After hearing the grievances, the BWSSB Engineers and the Corporator have assured the residents to take care of all the complaints and issue necessary directions to the Contractor accordingly.