City Kemp News
The Koramangala 4th Block Residents’ Welfare Association held a meeting on November 1 with BBMP Chief Engineer, Storm Water Drain, Executive Engineer, BBMP AEE and AE along with Surveyor Prakash, and discussed the various details of laying pipeline along 80 feet road from Sony World junction upto Bellandur lake. After lengthy discussion, it was decided to go ahead with the project immediately.
The Engineers and RWA committee members have also visited the spot near Nilgiris diversion drain where the work is in progress.
The Engineers insisted the contractor complete the drain work early, including drain across 80 feet road.