City Kemp News
In 6th Block Koramangala, Assistant Executive Engineer Lakshmi Kanth, Assistant Engineer Mohan inspected the works going on – laying of sewage lines in 19th Main, 6th Block on Saturday. AEE Lakshmi Kanth directed to the Supervisor Naryana and Sampath who is incharge to lay the sewage lines to tie a caution tape and install sign boards (BWSSB Work is in Progress) and look into the safety measures while digging or excavating by JCB Vehicle. As per the direction of Additional Chief Engineer Sathish, the sewage lines from Indian Bank to Kota Katchori is also being replaced with pipes of higher diameter.
Regarding about the submains pipelines (80ft road), the blockage of sewage lines are being cleared one by one – at present from Passport office to NGV is going on; and next stage will be from NGV Signal to Sony World Signal will be cleared as soon as possible. In this regard, the President of 6th Block Residents’ Welfare Association Jayaramu is following up continuously with Waste Water Management Chief Engineer Ramkrishna, Additional Chief Engineer Sathish and AE Ramesh who is incharge of submains, said Secretary of 6th Block RWA Suresh N Gowda.
BWSSB Officials inspect works in 6th Block
