J BLOCK is ROADBLOCK courtesy BBMP: Residents of J Block are facing hardship for the past two months as the contractor who dug up the 2nd Cross Road and 3rd Cross Road for laying a new rain water drain connecting other drains is doing at a snail’s pace. Stones, mud lie helter skelter and there is no sign of when will the contractor cover it with slabs and make the road motorable. Besides the roads are very narrow.
Roadblock: No end in sight
